N25 Waterford Bypass PPP
PH McCarthy with associated consultants was appointed to undertake the detailed design of highways, structures, and environmental elements of the N25 Waterford bypass. The project is expected to take 2.5 years to complete.
The project consists of 23km long 2x2 lane dual carriageway; 8km of new dual 2 lane all purpose link roads; construction of 52 structures including a major river crossing, 5 large viaducts, 9 overbriges, 9 underbridges, 19 culverts and 9 accommodation structures; provision of over 11km of local and regional roads and provision of toll facilities.